StackRating

An Elo-based rating system for Stack Overflow
Home   |   About   |   Stats and Analysis   |   Get a Badge
Rating Stats for

JooBear

Rating
1499.97 (3,671,347th)
Reputation
107 (685,936th)
Page: 1
Title Δ
how to make a dummy job to run for 30 minutes in controlm 0.00
Trigger Control-M folder but it should ignore few jobs in the Folder 0.00
Control-m email alert for when the job is not triggered by spefic t... 0.00
Control-M Prerequisites - Make job dependent on server availability 0.00
Who can i do specific time settings on periodic calendar in control... 0.00
Control-M Calendar -- is it possible to set a job run on calendar w... 0.00
Periodic Calendar value shifting after mid year 0.00
Is there any possibility to integrate Control-M job execution (Auto... 0.00
Control-M: it is possible if first job fails to continue running -0.00
Control-M Workload Policy for Jobs waiting on Resource 0.00
Control-M: Persisting column layout 0.00
Control-M: cyclic children jobs -0.03
Control-M - Raise a shout if any of the jobs inside a folder fails 0.00
Accessing control-m jobs from linux command line 0.00
How to send an email when the workflow doesnt start in Informatica 0.00
Control M specific job status to a excel 0.00
Control M job shout/send email on a condition 0.00